Burke-Divide Electric Coop. intends to install two (2) high-voltage circuit breakers and associated equipment on a 60 kV transmission system emanat…
Project RELIEF will deploy advanced high-temperature, low-sag (HTLS) conductors on 250 miles of transmission lines, leading to 2x capacity increase…
Replacement of existing expulsion fuses with fire safe fuses and arresters in higher fire risk areas of the island of Kauai.…
EECA proposes the dedication of three acres for the construction of a new electric substation. The site would require perimeter fencing. Site is i…
Replacement of aged/deteriorated utility poles, Reconductoring/upgrading of 1.53 miles of overhead 35kV sub-transmission lines using vibration-res…
Remove and replace 234 aging existing distribution structures, including poles, crossarms, and insulators, with new components designed to meet mod…
Replacing existing aging pole structures with new pole structures.…
Changing out existing power poles/reclosers with new poles and sophisticated protection equipment. HEC will also be adding communications equipment…
The project consists of a feasibility study of CPU's two existing backup generation units and assessment of future upgrade options, targeted upgrad…
To meet the project objective, PSCYC will invest in a new power transformer, which will serve as the primary voltage step-down device within a plan…