Categorical Exclusion Determinations: B4.6

Upgrading mining site to 3-phase power. Trenching to place 3-phase line underground. Installation of a power vault and transformer. Installation of…
The Marana Upgrade Project (Project) is proposed by Arizona Electric Power Cooperative (AEPCO) to rebuild the existing Marana Substation within the…