The DOE Loan Programs Office is considering whether to issue a loan guarantee of a funding facility to the Alabama Power Company pursuant to its authority under the Energy Infrastructure Reinvestment 1706 Program.
GPC proposes expansion of the existing Anthony Shoals substation and the installation of a new Status Synchronous Compensator (STATCOM) at the exis…
Construct 20'x60' structure in which Substation/Switchgearwill be installed. Excavate trenches for conduit installation between Power Plants and S…
Replacement of existing reclosers with new vacuum reclosers, Addition of auto-source transfer equipment on our existing distribution lines to impro…
Installation of new transmission poles and overhead line equipment in existing right-of-way and removing of existing poles and accessories. Replace…
MVEA proposes to upgrade the Black Squirrel and Gresham substations to be SCADA ready. This includes upgrading six existing substation recloser con…
Replacing old AGOD (Automated Gang Operated Disconnect) blade switches involves removing and retiring the outdated one before installing a new sma…
To improve reliability and facilitate maintenance access, Bonneville Power Administration (BPA) proposes several improvements at the Silver Creek …
The City proposes to replace aging and outdated power line infrastructure in City circuits M2122 and M1822. Reconductoring 4.2 miles of distributio…
This project will rebuild a 1950's transmission and distribution line with modern materials, upgrading the poles, shortening spans, and upgrading t…