Project is to replace outdated and failing primary electrical infrastructure currently owned by the KY State Parks. Design and construction in proc…
Project is to replace outdated and failing primary electrical infrastructure currently owned by the KY State Parks. Design and construction in proc…
Construct 0.76 mi. of 3-phase line to connect two circuits. Install a 3000kVa transformer to connect two circuits. Convert 1.5 mi. of 1-phase lin…
Ravalli Electrical Cooperative plans to underground 21.3 miles of existing distribution lines in a designated high wildfire hazard potential area l…
The DOE Loan Programs Office (LPO) is considering whether to issue a loan guarantee of a funding facility to American Electric Power (AEP, or the Applicant) pursuant to its authority under the EIR 1706 Program.
Construction of 6 miles of new three-phase 12.5 kV distribution underground power line connecting two substations (Huntsville to Fisher, MN). The i…
WV/MD SMART Grid is an investment across West Virginia and Maryland communities that includes installing SCADA software in under-served areas, inst…
Rebuild 2.4 miles of distribution line and construct 2.4 miles of transmission on the same poles.…
Circuit retirement, site prep, and directional boring. Conversion of ~750 linear ft of existing overhead circuit to underground. Installation of 3,…
Installation of a new, redundant electrical feeder line from transmission lines on the west side of I-376 to the southern edge of the Neighborhood …