Categorical Exclusion Determinations: B4.12

The American Electric Power's (AEP's) Buckrun Switch to West Crawford 69 kV Transmission Line Rebuild Project will rebuild approximately 6.12 miles of existing linear transmission line infrastructure generally within its existing 60-foot-wide right-of-way (ROW) between the existing Blanchard Station and West Crawford Station (main line) and between the main line and South Vanlue Station, in Hancock and Wyandot counties, Ohio.
1) Rebuild 4,221 feet of overhead power lines behind secondary dune line to protect from encroaching ocean and remove existing poles. 2) Install 2,…
Project is to replace outdated and failing primary electrical infrastructure currently owned by the KY State Parks. Design and construction in proc…