The National Park Service proposes to reconstruct or replace existing utilities (electrical, water, gas, and communication) in new right-of-way (ROW) along State Road 4 in Technical Area (TA) 39 at Los Alamos National Laboratory (LANL).
The DOE Loan Programs Office (LPO) is considering whether to issue a loan guarantee of a funding facility to the Alabama Power Company (APC) pursuant to its authority under the EIR 1706 Program.
1) Rebuild 4,221 feet of overhead power lines behind secondary dune line to protect from encroaching ocean and remove existing poles. 2) Install 2,…
Build a 9.75 mile 3-phase overhead distribution electric line on private property along HWY 30 to connect two distribution feeders. This will consi…
Site work to prep area for substation construction, including grading, stormwater, erosion control, material import, and compaction, ground grid in…
Project is to replace outdated and failing primary electrical infrastructure currently owned by the KY State Parks. Design and construction in proc…
Project is to replace outdated and failing primary electrical infrastructure currently owned by the KY State Parks. Design and construction in proc…
Construct 0.76 mi. of 3-phase line to connect two circuits. Install a 3000kVa transformer to connect two circuits. Convert 1.5 mi. of 1-phase lin…
Ravalli Electrical Cooperative plans to underground 21.3 miles of existing distribution lines in a designated high wildfire hazard potential area l…
Construction of 6 miles of new three-phase 12.5 kV distribution underground power line connecting two substations (Huntsville to Fisher, MN). The i…