The project will be the complete physical demolition of Building 526. Building 526 is 27,194 sq. ft. and was built in 1943. The building was used f…
Naval Nuclear Laboratory will be contracting to perform Decontamination and Decommissioning (D and D) Projects (Task Order No. 2) to remediate, dismantle, and dispose of select above grade structures and select components associated with Building 19 (S3G Plant Support/Interactive Display Equipment (IDE) Building), Building 20 (Equipment Service Building), Building 21 (Fuel Service Building), Building 80A and 80B (M-140 Complex), and Pad 90 (MARF Reactor Access Enclosure).
The U.S. Department of Energy (DOE) is proposing to authorize the administration of a four-phase prize competition, known as the "National Building…
The scope of the West Campus (formerly Valley National Gas) Demolition and Site Restoration Project includes modifications to the site to support mobilization and future decommissioning operations by Department of Energy Office of Environmental Management (DOE-EM) at the Naval Nuclear Propulsion Program (NNPP) Bettis Laboratory.
Hanford Mission Integration Solutions (HMIS) and their subcontractors perform containment, removal, and disposal of lead-based paint in accordance …
The Kesselring Site Perimeter Roads Maintenance Project will rehabilitate approximately 11 miles of the Kesselring Site Perimeter Roadway System to include 6 miles of the perimeter loop road and 5 miles of spur roads.
The U.S. Department of Energy (DOE) administers the Weatherization Assistance Program (WAP) as authorized by Title IV, Energy Conservation and Prod…
The U.S. Department of Energy (DOE) administers the Weatherization Assistance Program (WAP) as authorized by Title IV, Energy Conservation and Prod…
The Kesselring Site Bathroom Refurbishment and Lactation Room Project will convert two (2) existing rooms into lactation rooms and refurbish bathrooms throughout the Kesselring Site (KS) ensuring the restrooms meet code requirements and function properly for a professional environment.
WAPA will rebuild the 34.5-kV yard in the location of the current 69-kV yard after the 69-kV yard is demolished.…