The scope of work for this task is to Apply FireDam to fix contamination at the Transuranic Waste (TRU) Processing Facility located at Low Activity…
Install bird control netting/clean up and seal floor drains at Receiving Basin for Offsite Fuel (RBOF).…
All Uninterruptible Power Supply (UPS) systems not related to security or cranes will be removed from L-area.…
Naval Nuclear Laboratory will be contracting to perform Decontamination and Decommissioning (D and D) Projects (Task Order No. 2) to remediate, dismantle, and dispose of select above grade structures and select components associated with Building 19 (S3G Plant Support/Interactive Display Equipment (IDE) Building), Building 20 (Equipment Service Building), Building 21 (Fuel Service Building), Building 80A and 80B (M-140 Complex), and Pad 90 (MARF Reactor Access Enclosure).
This activity is for completing a safe shutdown and deactivation process for F/H Lab (772-F, 772-1F and 285-3F).…
The scope of the West Campus (formerly Valley National Gas) Demolition and Site Restoration Project includes modifications to the site to support mobilization and future decommissioning operations by Department of Energy Office of Environmental Management (DOE-EM) at the Naval Nuclear Propulsion Program (NNPP) Bettis Laboratory.
This EEC includes the removal and replacement of an awning from Building 292-2F.…
This EEC covers planning activities for F/H Lab Tank Cells A, B, C, and D deactivation.…
This EEC covers planning activities for F/H Lab Tank Cells A, B, C, and D deactivation.…
Receiving Basin Off-Site Fuel (RBOF) Cask Pad Containment Activities…