Electric Lightwave Fiber Optic Cable near Columbia Substation CX(s) Applied: B4.7Date: 01/25/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Office of NEPA Policy and Compliance
January 25, 2016Electric Lightwave Fiber Optic Cable near Columbia Substation
CX(s) Applied: B4.7
Date: 01/25/2016
Location(s): Washington
Offices(s): Bonneville Power Administration
Bonneville Power Administration (BPA) proposes to allow Electric Lightwave, LLC to install fiber optic cable across BPA fee-owned property adjacent to BPA’s Columbia Substation in Douglas County, Washington.