FEMP provides documents, templates, and checklists to aid measurement and verification (M&V) in the post-installation and performance period of DOE IDIQ ESPCs.
Federal Energy Management Program
July 18, 2025FEMP provides documents, templates, and checklists to aid measurement and verification (M&V) in the post-installation and performance period of Department of Energy (DOE) indefinite-delivery, indefinite-quantity (IDIQ) energy savings performance contracts (ESPCs).
Generation 4 M&V Plan Documents
M&V Guidelines: Measurement and Verification for Performance-Based Contracts Version 5.0
The Gen4 contract post-installation and performance period M&V relies upon the latest version of FEMP’s guidelines.
Generation 3 M&V Post-Installation and Performance Resources
DOE ESPC Gen3 IDIQ (2017) Post-Installation Report Outline (IDIQ Attachment J-9)
Required format for post-installation M&V report
DOE ESPC Gen3 IDIQ (2017) Annual Report Outline (IDIQ Attachment J-10)
Required format for an ESPC annual report
Post-Installation Measurement and Verification Report Review Checklist
Checklist for the review of the post-installation measurement and verification report
Annual Measurement and Verification Report Review Checklist
Checklist for the review of the annual and verification report
Generation 2 M&V Post-Installation and Performance Resources
DOE ESPC Gen2 IDIQ (2008) Post-Installation Report Outline (IDIQ Attachment J-9)
Required format for post-installation M&V report
DOE ESPC Gen2 IDIQ (2008) Annual Report Outline (IDIQ Attachment J-10)
Required format for an ESPC annual report