Startup activities at ORP's WTP received a boost when permanent power was supplied to the Low-Activity Waste (LAW) Facility’s switchgear building.

This month marks the 10th anniversary of radioactive operations for Actinide Removal Process/Modular Caustic Side Solvent Extraction Unit facilities.

Structural concrete foundation and wall placements are complete for the Effluent Management Facility (EMF) at Hanford’s WTP.

Staff from EM ORP contractor WRPS recently took science and engineering to a local middle school as part of the STEM Like Me! program.

Highly hazardous working environments at SRS make it necessary to have robots complete important but remote work in areas where humans cannot go.

EM’s Office of River Protection (ORP) has given Bechtel National (BNI), the contractor for the Hanford Waste Treatment and Immobilization Plant (WTP),

EM Office of River Protection tank farms contractor Washington River Protection Solution (WRPS) is making it loud and clear that worker safety

Hanford's WTP is on track to vitrify tank waste as soon as December 2021, Brian Vance, manager of the EM Office of River Protection, said last week.

Modifications are complete to two of the reaction vessels of the Integrated Waste Treatment Unit (IWTU).

Field preparations have begun for the installation of two interim surface barriers in the SX Tank Farm at EM’s Hanford Site.