July 30, 2019

thumbnail
SRS Liquid Waste Contractor Earns Almost $28.6 Million of Available Fee

EM’s Savannah River Operations Office awarded its liquid waste contractor an “excellent” rating and nearly $28.6 million.

July 30, 2019

thumbnail
Hanford Sets Key Vessels for Effluent Management Facility

Crews at EM’s Hanford Waste Treatment and Immobilization Plant recently set two massive processing vessels.

July 23, 2019

thumbnail
Collaborating With SRS Helps Hanford Prepare to Treat Tank Waste

As Hanford prepares for tank waste treatment, the site collaborated with EM’s Savannah River Site for lessons on transitioning to waste treatment.

July 16, 2019

thumbnail
Engineer Wins Award for Analysis Advancing SRS Waste Disposal

Liquid waste contractor at the Savannah River Site recently honored one of its employees for his analysis that will help measure environmental risk.

July 9, 2019

thumbnail
Hanford Workers Protect Environment, Further Safety With Tank Farm Barrier

EM’s Hanford Office of River Protection took another step forward by installing an interim surface barrier in SX Tank Farm.

July 9, 2019

thumbnail
Hanford Safety Specialists Earn OSHA Certifications

Six safety representatives with Office of River Protection tank farms contractor recently received Safety and Health Administration certifications.

June 25, 2019

thumbnail
EM Crews Think Outside the Box for Hanford Tank Waste

EM Office of River Protection recently developed unique tools to remove contaminated pieces of equipment from single-shell waste storage tanks.

June 25, 2019

thumbnail
Under Secretary Paul Dabbar Tours WTP as Part of Hanford Visit

DOE Under Secretary for Science Paul Dabbar, receives a briefing June 19 in the Low-Activity Waste facility at the Hanford Site.

June 18, 2019

thumbnail
Hanford WTP Awarded Top Certification for Safety and Health Excellence

Hanford’s Waste Treatment and Immobilization Plant has earned DOE’s highest certification for excellence in occupational and health protection.

June 11, 2019

thumbnail
Savannah River Site Breaks Ground on Saltstone Disposal Units 8 and 9

EM workers broke ground June 10 on two more large-scale units.