Related to UChicago Argonne’s implementation of DOE’s 10 C.F.R. Part 851 electrical safety program requirements at Argonne National Laboratory.
Worker Injury During Preparation of a Piping System for Pressure Testing at the Hanford Site
Related to conduct of operations and work processes at the Molten Salt Reactor Experiment at the Oak Ridge National Laboratory.
Related to NWP’s implementation of safety requirements for power transmission and distributions systems at the Waste Isolation Pilot Plant.
EA assessed the effectiveness of the Paducah Site readiness assurance program, which is a sitewide program element of a DOE emergency management progr
Associated with retaliation by Savannah River Nuclear Solutions, LLC at the Savannah River Site.
Associated with electrical safety program requirements at the Nevada National Security Site.
Related to a security event involving the unauthorized disclosure of classified information at the Oak Ridge National Laboratory.
Worker Safety and Health Enforcement Consent Order issued to Consolidated Nuclear Security, LLC relating to an employee fall into a utility pit
Worker Safety and Health Enforcement Letter issued to Los Alamos National Security, LLC relating to work planning and control deficiencies