SRNL has been requested to evaluate oxidant levels in groundwater. Revision 2: Update activity start and end date. Remove unnecessary chemicals and…
This project would involve the installation, maintenance, and diagnostic monitoring of sensors in various areas of the NNSS and at approved offsite…
The NNSA/NFO Management and Operating (M and O) Contractor maintains seismic monitoring stations at mines in the Nevada National Security Site regi…
CO2 injected into unconventional oil reservoir (EOR) in the Bakken Formation, storing CO2. Field work.…
Plan development of the River Parish Sequestration Project, a CO2 transportation and storage solution, and site characterization. Construct a well …
Characterization of P-Area Groundwater Operable Unit plumes is required. In Fiscal Year 2026, this will include drilling 18 soil borings to collect…
Work is for a cultural survey by Plateau Geoscience Group as part of preparation for undergrounding of distribution lines in the project area. The …
At the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit (OU), one existing monitoring well (CMP 50B) has been determined to be compromise…
The proposed actions would consist of a site condition assessment of the existing groundwater extraction wells, associated existing piping, existin…
Collecting 20-miles across 4-lines of 2-D surface seismic data.…