The Central Alarm Station (CAS) is important for safe and effective operation of the Bettis Site. The CAS houses servers, computers, and monitoring equipment associated with systems to ensure safe operations.
The Kesselring Site Building 107 Refresh Project will address three key building renovation activities: a full-scale roof replacement, roof-top air handler unit replacements, and dust collection system ductwork reconfiguration.
The U.S. Department of Energy (DOE) is proposing to provide federal funding to Durion, Incorporated for the development and demonstration of a ther…
A dedicated laydown area for staging railroad materials south of CFA-633 is required. Although this area was mowed earlier this summer, additional …
Relocate 704-738-K K-Area Interim Surveillance (KIS) Team personnel trailer within the K-Protected Area to the west/adjacent of 704-729K Radiologic…
Feasibility and FEED study to scale up processes for converting natural and recycled synthetic graphite ton-scale pilot plant which will culminate …
The U.S. Department of Energy (DOE) proposes to construct a Central Utility Plant (CUP) east of the Far Experimental Hall (FEH) Building 999 (B999)…
Bonneville Power Administration (BPA) proposes to fund the Idaho Department of Fish and Game (IDFG) to install two pre-fabricated metal sheds withi…
Building 263-241F is currently an open storage facility originally constructed to support the Waste Solidification Building (WSB) storage requireme…
New RSWF capability/unit to design and install a storage pad for NRIC microreactors post-irradiation. Construction of a storage pad and necessary u…