The scope of the Bettis Atomic Power Laboratory North Campus Utility Corridor Project is to support the existing Fire Water and City Water utility services to the North Campus area, which are currently supplied by a looped system that provides redundant service from two directions in the event of a localized system failure.
The U.S. Department of Energy (DOE) EM-LA is proposing to install stormwater controls within the 100-yr floodplains of Effluent, Mortandad, North Ancho, and Potrillo Canyons within Los Alamos National Laboratory (LANL) near Los Alamos, New Mexico.
East River requested a new bay addition at WAPA's Beresford Substation in South Dakota. …
The Central Alarm Station (CAS) is important for safe and effective operation of the Bettis Site. The CAS houses servers, computers, and monitoring equipment associated with systems to ensure safe operations.
Install a rainwater drain system along the 221-H East wall sections 7-18 to drain the rainwater on the roof to the stormwater system. …
The purpose of this project is to install three (3) new reinforced concrete pipes (RCP) with precast reinforced concrete headwalls on Water Gap Roa…
Western Area Power Administration (WAPA) proposes to construct a new Point of Interconnection (POI) at the existing Denison Substation to accommoda…
The U.S. Department of Energy (DOE) plans to complete site preparation for a new pump and treat facility at the Paducah Gaseous Diffusion Plant (PGDP).
The Knolls Laboratory Land Disposal Area (LDA) Corrective Measure Implementation (CMI) Project is being undertaken as a Corrective Measure remedy to remediate soil contaminated with metals and volatile organic compounds.
DOE-LM is proposing to conduct routine long-term surveillance and maintenance (LTS and M) actions at the Split Rock, Wyoming, Disposal Site located…