Western Area Power Administration, Sierra Nevada Region (WAPA) proposes to relocate poles of an approximately 0.25 mile stretch of the line that pa…
WAPA proposes to repair a splice on the CPJ-ODA transmission line. To aid in this process, a helicopter landing zone was selected which is off of W…
Western Area Power Administration, Sierra Nevada Region (WAPA) proposes to replace several poles along the 0.8-mile long SIBT-SIB line and rebuild …
Western Area Power Administration, Sierra Nevada Region (WAPA) is responsible for the operation and maintenance of several federally owned and oper…
Northern California Power Agency (NCPA), a customer of Western Area Power Administration (WAPA), has requested that WAPA's line crew perform mainte…
WAPA proposes to replace spacers along a portion of the CPJ-ODA transmission line. To aid in this process, six helicopter landing zones were select…
On January 6, 2025, WAPA's roads maintenance coordinator requested an expedited review for repair of a newly discovered sinkhole which created a ha…
WAPA is proposing to demolish and dispose of an existing unused storage building, located at the Elverta Substation. This building is known as Buil…
The Western Area Power Administration (WAPA) is proposing to perform aerial Light Detection and Ranging (LiDAR) surveys to obtain accurate and comp…
WAPA proposes to replace insulators along a portion of the HUR-TRY transmission line. To aid in this process, two helicopter landing zones were sel…