WAPA proposes to replace insulators along the ODA-TCY transmission line.…
WAPA proposes to replace insulators along a portion of the HUR-TRY transmission line. To aid in this process, one helicopter landing zone was selec…
WAPA proposes replacement of insulators along the CW-RSW line and intends to use the helicopter landing zone on private property approximately 500 …
Western Area Power Administration, Sierra Nevada Region (WAPA) proposes to participate in the California Independent System Operator's (CAISO) Exte…
The City of Oakley has requested that WAPA relocate and install two wood poles for towers 18-7 and 18-8 and remove pole 18-6, currently adjacent to…
WAPA proposes emergency replacement of spacers on selected spans of its CPJ-ODA transmission line.…
Western Area Power Administration, Sierra Nevada Region (WAPA) proposes a rate process to continue existing formula rates for the Central Valley Pr…
WAPA proposes to replace spacers on its CPJ-ODA transmission line.…
The Desert Southwest Region (DSW) of the Western Area Power Administration (WAPA) proposes new formula rates for firm and nonfirm pointto-point (P2…
This Amended Determination follows the approval of additional funds and extended period of performance to support the project team's small-scale, r…