The Western Area Power Administration proposes a 5-year formula rate extension through March 31, 2030 that is unchanged from the existing Rate Sche…
The Western Area Power Administration proposes a 5-year formula rate extension through June 7, 2029, in accordance with 10 CFR 903.23(a).…
The SLCA/IP consists of the CRSP units and its participating projects, Dolores and Seedskadee, as well as two small individual projects, Rio Grande…
Power from the Colorado River Storage Project (CRSP) will be provided for facilities of the Navajo Gallup Project, specifically, the San Juan Later…
The Colorado River Storage Project Management Center (CRSP MC) of the Western Area Power Administration (WAPA) proposes a new Salt Lake City Area I…
Western Area Power Administration (WAPA) proposes a 5-year, Colorado River Storage Project (CRSP) Joint Transmission Dispatch Service (JTDS)…
Western Area Power Administration (WAPA) proposes a 5-year, Colorado River Storage Project (CRSP) Joint Transmission Dispatch Service (JTDS) formul…
The SLCA/IP consists of the CRSP units and its participating projects, Dolores and Seedskadee, as well as two small individual projects, Rio Grande…
The Provo River Project consists of a powerplant on a dam at Deer Creek on the Provo River in central Utah. The Deer Creek power station has an ins…
Western Area Power Administration proposes a 5-year Provo River Project Firm Power Formula Rate through March 31, 2025, which is unchanged from the…