Western Area Power Administration proposes a 5-year Provo River Project Firm Power Formula Rate through March 31, 2025, which is unchanged from the…
The Falcon and Amistad Projects Firm Power Rate Formula will expire on June 7, 2019. Western proposes a 5-year formula rate extension through June …
Categorical Exclusion Determination
Categorical Exclusion Determination
CRSP Rate Order No. WAPA-169 CX(s) Applied: B4.3Date: 02/25/2015 Location(s): ColoradoOffices(s): Western Area Power Administration-Colorado River Storage Project Management Center
Installation of Metering and Circuit Breaker at Powell 69-Kilovolt SubstationCX(s) Applied: B4.11Date: 01/25/2011Location(s): Page, ArizonaOffice(s): Western Area Power Administration-Colorado River Storage Project Management Center
Power Rate Formula for the Provo River Project of the Western Area Power AdministrationCX(s) Applied: B4.3Date: 10/26/2009Location(s): ColoradoOffice(s): Western Area Power Administration-Colorado River Storage Project Management Center