Bonneville Power Administration (BPA) proposes to allow T-Mobile to upgrade two of its existing telecommunications facilities collocated with BPA-o…
AT&T proposes to upgrade their wireless communications infrastructure that is currently located on BPA’s existing transmission line towers on the E…
The Bonneville Power Administration (BPA) proposes to replace 2 wood pole transmission structures along the South Tacoma-Southwest No. 1 230-kV tra…
Bonneville Power Administration (BPA) proposes to allow T-Mobile to upgrade its existing telecommunications facility located at the BPA-owned Snoho…
Bonneville Power Administration (BPA) proposes to grant permission to the Tualatin Hills Park & Recreation District (THPRD) to construct a paved, p…
Bonneville Power Administration (BPA) proposes to allow Bagley Park Investments, LLC to install a new sewer line within a BPA fee-owned transmissio…
Award Number: DE-EE0008927, CX(s) Applied: A9, B3.6, Bioenergy Technologies Office, Location(s): WA, Office(s): Golden Field Office
Bonneville Power Administration (BPA) proposes to allow an adjacent landowner to pave a 550-foot section of existing gravel road located on the sou…
Bonneville Power Administration (BPA) proposes to allow Clark Public Utility District (Clark PUD) to install underground electric service lines on …
Bonneville Power Administration (BPA) proposes to reterminate an existing transmission line and add related equipment at its Monroe Substation in S…