Bonneville Power Administration (BPA) proposes to address one surface impairment that was identified on the 500-kilovolt Monroe-Custer No. 2 transm…
Bonneville Power Administration (BPA) proposes to partially compensate Puget Sound Energy (PSE) to bury approximately 230 feet of overhead electric…
Bonneville Power Administration (BPA) proposes to upgrade its Very High Frequency (VHF) radio system at the existing Sickler Radio Station, located…
Bonneville Power Administration (BPA) proposes to install a new heating, ventilation and air conditioning (HVAC) system for the control house at Mo…
BPA is proposing to fund the Confederated Tribes of the Colville Reservation (CTCR) to purchase the Upper Beaver Creek Balky South Property, which …
Bonneville Power Administration (BPA) proposes to replace a wood pole structure and associated structural/electrical components (e.g. cross arms, i…
Bonneville Power Administration (BPA) proposes to fund the Yakama/Klickitat Fisheries Project (YKFP) to implement the Piscoe Creek Culvert Replacem…
Bonneville Power Administration (BPA) proposes to fund Tacoma Power to replace two of their wood pole transmission line structures.…
Award Number: DE-EE0009112, CX(s) Applied: A9, B3.6, Advanced Manufacturing Office, Location(s): WA, Office(s): Golden Field Office
Bonneville Power Administration (BPA) proposes to fund the Asotin County Conservation District in the installation of Post-Assisted Log Structures …