Bonneville Power Administration (BPA) is proposing to resurface the bridge crossing of Butte Creek, which leads to BPA’s Raymond Substation. The br…
The U.S. Department of Energy (DOE), Richland Operations Office (RL), Infrastructure and Services Division (ISD) proposes to construct a modular cl…
The U.S. Department of Energy (DOE), Richland Operations Office (RL), Infrastructure and Services Division proposes to construct a parking lot at t…
BPA is proposing to perform routine road maintenance to approximately 2.69 linear miles of existing access road for the Grand Coulee – Chief Joseph…
Bonneville Power Administration (BPA) is proposing to allow Comcast to remove and replace 128 feet of existing above ground strand and coaxial cabl…
Bonneville Power Administration (BPA) proposes to perform routine road maintenance, repair, and improvements on approximately 1,650 linear feet of …
The Bonneville Power Administration (BPA) proposes to correct two areas along the St. Clair-South Tacoma transmission line where the ground to cond…
BPA proposes to replace deteriorating wood pole structures and associated structural/electrical components (e.g. cross arms, insulators, guy anchor…
BPA proposes to replace deteriorating wood pole structures and associated structural/electrical components (e.g. cross arms, insulators, guy anchor…
BPA proposes to perform in-kind replacement of wood pole structures and associated structural/electrical components (e.g. cross arms, insulators, g…