The U.S. Department of Energy (DOE), Richland Operations Office (RL), Infrastructure and Services Division (ISD) proposes to replace the undersized…
BPA proposes to perform in-kind replacement of wood pole structures and associated structural/electrical components (e.g. cross arms, insulators, g…
Bonneville Power Administration (BPA) proposes to allow PacificCorp to install underground fiber into BPA’s Megler Radio Station. Trenching for fib…
The Three Rivers Road Runners Club plans to conduct the 2019 Plutonium Man Triathlon on Saturday, August 31, 2019. This swim-bike-run triathlon wou…
Bonneville Power Administration (BPA) proposes to repair the metal roof and an exterior vent on the equipment building at the Metaline Radio Statio…
Bonneville Power Administration (BPA) proposes to issue a revocable land use agreement to Clark Public Utilities District (PUD) to remove and place…
The Department of Energy, Richland Operations office, Site Stewardship Division proposes to decommission eleven Underground Injection Control wells…
Bonneville Power Administration (BPA) proposes to allow T-Mobile to upgrade an existing telecommunications facility located on BPA fee-owned proper…
Bonneville Power Administration (BPA) proposes to allow Verizon to upgrade their antennas and equipment at an existing site called Rocky Flats. The…
The U.S. Department of Energy, Richland Operations Office, Infrastructure and Services Division proposes to remove and reroute portions of the 100 …