Award Number: DE-EE0008985, CX(s) Applied: A9, B3.6, B3.15, Solar Energy Technologies Office, Location(s): UT, Office(s): Golden Field Office
Western Area Power Administration (WAPA), Rocky MountainRegion (RMR), proposes to approve an interconnection request from PacifiCorp (dba RockyMoun…
Award Number: DE-EE0008917, CX(s) Applied: A9, B3.6, Bioenergy Technologies Office, Location(s): UT, Office(s): Golden Field Office
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), completed an emergency relocation of Structure 39/3 on the Flaming Gorge-Ver…
Vendor Geotek will conduct pressure function and pressure actuation tests of the pressure coring system as well as make necessary tool modification…
Western Area Power Administration (WAPA), Rocky MountainRegion (RMR), proposes to replace two vacuum circuit breakers and associated equipment atWA…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to approve an interconnection request from PacifiCorp (dba Rocky Mo…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to replace two vacuum circuit breakers and associated equipment at …
Software and a sensor network will be added to an existing coal-fired power plant.…