CX-023568: Flaming Gorge-Vernal No. 3 138-kV Transmission Line Structure Relocation

Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to relocate Structures 20/6 through 21/4 on the Flaming Gorge-Verna…

Office of NEPA Policy and Compliance

April 20, 2021
Estimated Read Time   min

Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to relocate Structures 20/6 through 21/4 on the Flaming Gorge-Vernal No. 3 (FGE-VNL-3) 138-kV Transmission Line in Uintah County, Utah.