Upgrading Lignin-containing Biorefinery Residues for Bioplastics Award Number: DE- EE-0007104 CX(s) Applied: A9, B3.6 Bioenergy Technologies Office Date: 10/26/2015 Location(s): TX Office(s): Golden Field Office
Extension of HPHT DP Sensor and Virtual Flowmeter Tasks of Project CX(s) Applied: A11, B3.6Date: 10/23/2015 Location(s): TexasOffices(s): National Energy Technology Laboratory
Reducing the Impact of Gas Shale Development: Advanced Analytical Methods... CX(s) Applied: A9, B3.1Date: 10/06/2015 Location(s): TexasOffices(s): National Energy Technology Laboratory
Deploy Wireless Guest Networks at Strategic Petroleum Reserve Sites CX(s) Applied: B1.7Date: 10/01/2015 Location(s): TexasOffices(s): Strategic Petroleum Reserve Field Office
Subsea Produced Water Sensor Development CX(s) Applied: A9, A11, B3.6Date: 09/29/2015 Location(s): TexasOffices(s): National Energy Technology Laboratory
Hydraulic Fracturing Test Site CX(s) Applied: A9, B3.1, B3.7Date: 09/29/2015 Location(s): TexasOffices(s): National Energy Technology Laboratory
Dredging of Bryan Mound Raw Water Intake Structure Inlet Channel CX(s) Applied: B1.3Date: 09/28/2015 Location(s): TexasOffices(s): Strategic Petroleum Reserve Field Office
ADAS Life Cycle Management Services, 2015-2020 CX(s) Applied: B1.7Date: 09/25/2015 Location(s): TexasOffices(s): Strategic Petroleum Reserve Field Office
NRG CO2NCEPT CX(s) Applied: A9Date: 09/23/2015 Location(s): TexasOffices(s): National Energy Technology Laboratory
Inspect Big Hill 48 Inch Raw Water Intake Pipeline (BH-MM-1200) CX(s) Applied: B1.3Date: 09/21/2015 Location(s): TexasOffices(s): Strategic Petroleum Reserve Field Office