Install Trailers and Refurbish Parking Lot, B-AreaCX(s) Applied: B1.15Date: 04/06/2009Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office
Deactivation of the 105-R Reactor BuildingCX(s) Applied: B1.28Date: 03/27/2009Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office
Rev 1: Replace sample platform ladder and stream crossing cables as needed at PB-3, SC-4, and FM-6.…
Subcontractor will repair 703-45A. The Subcontractor "will not" disturb the existing roof while performing these repairs on 703-45.…
Subcontractor will repair 741-N. The Subcontractor "will not" disturb the existing roof while performing these repairs on 741-N.…
Troubleshoot/Repair/Replace ventilation fan in Men's/Women's Restroom at 704-N.…
Site Construction to Remove Old and Install New Cell Phone Lockers in K-Protected Area…