Additional Characterization and Well Installations at the M-Area Hazardous Waste Management Facility CX(s) Applied: B3.1 Date: 04/25/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Office of NEPA Policy and Compliance
April 25, 2013Additional Characterization and Well Installations at the M-Area Hazardous Waste Management Facility
CX(s) Applied: B3.1
Date: 04/25/2013
Location(s): South Carolina
Offices(s): Savannah River Operations Office
Six wells will be drilled to depths ranging from approximately 100 to 200 feet to characterize the distal portion of the volatile organic compound (VOC) plume down-gradient of the A-Area Burning Rubble Pits/Miscellaneous Chemical Basin/Metals Burning Pit Operable Unit (ABRP/MCB/MBP OU) airlift recirculation well system.
CX(s) Applied: B3.1
Date: 04/25/2013
Location(s): South Carolina
Offices(s): Savannah River Operations Office
Six wells will be drilled to depths ranging from approximately 100 to 200 feet to characterize the distal portion of the volatile organic compound (VOC) plume down-gradient of the A-Area Burning Rubble Pits/Miscellaneous Chemical Basin/Metals Burning Pit Operable Unit (ABRP/MCB/MBP OU) airlift recirculation well system.