The Bundle Storage (MTR) Rack is Safety Significant Design feature that is located in Section 3 of the Hot Canyon of 221-H. This DCP replaces exist…
Road D milling, paving, and striping.…
The filtration rate at the Salt Waste Processing Facility (SWPF) has been significantly less than the design target. Savannah River Mission Complet…
This project will be evaluating the use of different solvents for the purposes of replacing Vertrel XF.…
Perform building 703-1B renovations.…
C-Area Laydown Yard install shelter and rack.…
704-C Repair water damage in rooms 4 and 5.…
Clean and repaint the service bridge at 686-G, Steel Creek Dam.…
Scarify concrete and epoxy coat of Building 607-82G.…
Renovate rooms 1 and 2 at 705-N.…