The On-Dock Rail (ODR) straddle carrier will be dismantled and removed from the SRS.…
645-1N, Replace flooring and pre and paint walls.…
Subcontractor will provide roof repairs at 731-N.…
Remove the solenoid valve which controls the plant air system regulator.…
Each of the two Work Orders covers the replacement of a Safety Steam Relief Valve.…
Remove building 707-11F and dispose in C and D Landfill.…
Remediation activities have been completed at several sites within A- and M-Areas.…
The damaged portion(s) of the DW line needs to be located, repaired and/or replaced.…
Final deactivation and decommissioning (D and D) of multiple D-Area buildings including: 480-3D, 482-2D, 484-1D, 484-2D, 484-4D, 710-16D, 717-3D, a…
Chiller systems used to regulate the temperature of R and D instrumentation and devices require a coolant for proper operation.…