HVAC Chiller No. 1 and No. 3 cooling water vent valves are to be replaced with lighter ones and pipe hangers are to be reinforced.…
A load test is to be conducted on Melter Storage Box 3.…
Paint Fire Hydrants and PIV's in F-Area.…
709-1G, Replace tile and wallboard in ladies shower.…
Subcontractor will provide roof repairs at Building 263-170H (Tritium Warehouse).…
Subcontractor will provide roof repairs at 233-24H.…
This is a painting job to repair some fixed contamination on 281-1H Delay Basin where there is peeling.…
Remove, replace, and paint base board wall cove base in K-Area Reactor Building (105-K) Personnel Wing.…
D and R "lean to" style outdoor storage shed (NBN, no building number) attached to the 105-L building near the Purification wing.…
Prepare Hill-Acme Metalworker for excess by disconnecting electrical, draining fluids, and transporting to storage.…