Pave additional areas South of H-Tank Farm to support personnel.…
Replace Wires to AHU No. 2 Disconnect in 717-F.…
Install additional receptacle in room 213 to supply power for laminator.…
Repair sidewalks at buildings 722-A, 722-5A and 784-7A.…
Transfer of 52 Gondola Railcars from DOESR to Energy Solutions.…
Collect surface water samples from Carolina Bay No. 125 and the Surface Water Impoundment Area at the Scrap Lumber Pile (631-2G).…
Hydrogen Recombination Catalyst Efficiency Testing by NTS Personnel.…
The primary goal is to measure the separation of the organic chemicals from the feed.…
Three degraded trailers known to contain asbestos containing materials will be demolished within the SRNL Limited Area.…
Alloys are exposed to hydrogen gas at elevated temperatures and pressures and tested in high pressure hydrogen gas.…