This activity is needed for the placement of two (2) 44' x 52' concrete pads and three (3) sealands (263-289H, 263-290H, and 263-291H).…
Prepare nonradioactive salt simulant solutions that are representative of waste streams from SRS and offsite for testing.…
Support of MCU operations will require the preparation and use of a combustible solvent mixture.…
Renovations to 725-N, Room 1 flooring in Central Shops.…
Subcontractor shall remove propane from the Lead Melter Propane Tank at 711-4N and the 716-4N PECMC Propane Tank so Construction may replace the fa…
Analytical Laboratories to move the pyrohydrolysis and hot block capabilities from F/H Lab to Lab C-154/158 in Building 773-A.…
A mockup of the H-Canyon sampler will be built and tested in 786-A.…
The current 234-H Main Side HVAC equipment was installed in the mid 1950's.…
A bead blaster located inside 717-F will be removed and excessed.…
Small scale electrolytic reduction experiments will be performed to understand and optimize a process for converting metal oxides to metals.…