730-4B Touch up paint and replace cove base for Rooms 135A, 135B, and 134.…
703-43A Remove/replace carpet.…
MOX-Termination has determined that portable building 149 is now excess.…
Subcontractor will provide roof replacement at 735-A.…
Subcontractor will provide roof repairs at 723-15A.…
Subcontractor to perform roof repairs for Building 794-A.…
The SRS Liquid Waste contractor sends routine characterization samples from the H-area and F-area Tank Farms to the Savannah River National Laborat…
Perform repairs to the interior of Building 706-N.…
Remove and replace floor covering in 704-K Maintenance Lunch Room.…
Verizon Wireless is upgrading the existing Mobile Access Distributed Antennae System (DAS) and multiple repeater sites located on the SRS facility …