A variety of materials will be obtained and prepared via sizing/heat treatment/mixing, and then pressed or compacted into a monolithic structure or…
722-N, Remove Damaged Floor Tiles in Lunchroom and Dispose of Properly.…
766-H Flood Damage Repair…
Installation of Video Telecommunications in 730-2B Conference Room 332.…
Install Video Telecommunications in 703-47A Room 128.…
Subcontractor will provide roof repairs at 703-6B.…
Subcontractor will provide roof repairs at 785-2A.…
Renovations due to water intrusion in buildings 722-A, 703-46A AND 703-42A.…
Replace old method of estimating flow by installing a flow meter with velocity sensors at the H-12 Outfall.…
Replace Glovebox Glass Panel T125-304-N-03 in the Load Line 4 & 5 Finish glovebox under modified open glovebox maintenance (OGM).…