Remove and re-install ceiling in Bldg. 735-A, B-001, B001 Ext. and B-002.…
This EEC covers various general renovations and modifications for Building 705-A, such as flooring/cove base replacement, ceiling tile and wall rep…
Repair concrete intruder barrier and sealcoat asphalt cover at R-Reactor Seepage Basin closed waste unit.…
FTF Repair/replace Domestic Water Header Isolation Valve DW-V-49.…
Renovate women's restroom in Building 751-1A.…
A subcontractor will remove sludge and/or waste water from various sanitary waste water systems at SRS.…
The attached Scope of Work provides details for the replacement of PIV 2070, which will be replaced with PIV 2230.…
Replace Breathing Air Filters and Housings as needed in H Canyon.…
100B Cabinet repainting.…
Replace the Phoenix Contact 120VAC-24VDC Bulk Power Supplies with 120VAC-24VDC UPS with Battery Storage.…