Recovering refrigerant from non-radiological appliances in L-Area that contain less than 5lbs refrigerant at full charge.…
Partial D and R of water wall (shielding) in DBCF and install redesign (TBD) for more efficient access.…
R and D and maintenance of radiation detection systems.…
Environmental Sciences and Biotechnology Group will evaluate the impact of a group of microorganisms on the physical properties of tar sands contai…
Environmental Sciences and Biotechnology Group will evaluate the impact of a group of microorganisms on the bioremediation of petroleum contaminate…
Work instructions are to safely install, setup, and anchor the new Bridgeport Milling Machine and accessories in 717-F.…
Occasionally, the vacuum lines in the 735-B hood systems need to be repaired with new lines due to normal wear and tear.…
Legacy asbestos waste in D-Area will be repackaged and transported for proper disposal.…
TCAP Column A, along with TCAP Feed Beds A and B and TCAP Product Bed B and TCAP Deuterium Beds A and B are to be replaced in-kind by new component…
The existing gravel road around the E-Area Trailer Complex will be paved.…