Prepare Clausing drill press for excess by disconnecting electrical, and transporting to storage.…
EEC for rheometers that use NIST traceable oil standards for verifying the functionality of the instruments.…
Install new Mlab 200R printer in Room 2 of 723-15A.…
294-F is out of service and no longer requires steam.…
Remove and Excess existing plate roller in building 717-3N and install a new plate roller.…
A simulant of the accelerated basin deinventory (ABD) dissolver solution will be prepared and then neutralized with sodium hydroxide.…
This EEC covers various routine maintenance activities that occur in MOX Complex Area warehouses 731-2F, 221-12F, 221-21F, and 221-22F.…
This activity covers the preparation (putting buildings and structures in a cold and dark state) and the demolition of buildings and structures in …
Provide emergency power to Curing room at 717-5N.…
Re-asphalt area located near building 710-14N.…