The MT proposes to design a replacement of the flooring/supports (all) and pipe supports (corroded only) associated with the sanitary lift station.…
Install one duct smoke detector in the common air supply duct downstream from HVAC-AHU-001 (H-234007-HVAC-AHU-001).…
This evaluation covers operation of miniature mixer-settlers and centrifugal contactors used for solvent extraction in 773-A laboratories C-077 and…
This R and D project will be examining separation of various uranium salts from environmental samples.…
Partially renovate Room B-065/B-067 to install a Thermal Ionization Mass Spectrometer (TIMS) in the new Ultra High Sensitivity Isotopic Analysis Fa…
This activity is for completing deactivation of the 236-H By-Product Facility.…
All activities pertain to the addition, removal or replacement of equipment located in Diffuser (DI) Glovebox T105-301-1, Cabinet 2, in Room 17 ofB…
In order to evaluate and enhance Pu down-blend processing/efficiencies, solid powder-like materials testing and test location(s) will be installed …
Install a Pressure Monitoring/ Relief Stations for legacy portable Z-Beds (aka Torpedoes) in the Tritium Facilities per M-DCF-H-13743.…
The existing water heater in Room 121 is being replaced with a similar model.…