The Emergency Operations Center (EOC) has operated beyond its expected lifetime and has become inadequate to provide necessary response for possibl…
Subcontractor will provide a roof replacement at 730-B. The Subcontractor “will“ disturb the existing roof while performing this roof replacement o…
Replace the rigging testing calibration machine at 705-N.…
Inspection and treatment of utility/power poles in the F, H and E-BG areas and facilities.…
Repair/Replace roof drain line sections from F-091 to F-150 per WO 1852076 and M-SOW-A-00213.…
Simulants will be prepared for testing at SRS to evaluate the effects of various reagents on groundwater brine chemistry.…
703-42A Install Data (4 Drops) in rooms 147, 148, and 149.…
703-43A Replace carpet and cove base.…
During routine sampling of HP-50 on 03/19/2022 by Savannah River Tritium Enterprise (SRTE), the pH of the effluent was identified as significantly …
Operation of a R and D Vacuum Furnace in Building 723-A. Metal parts will be heat treated or brazed within a vacuum or inert environment within the…