Maintenance to install a pair of eye bolts on door 410 North for Admin Seal applications.…
Work instructions are to safely install, setup, and anchor the new Bridgeport Milling Machine and accessories in 717-F. Additionally (Rev. 1): Plan…
This EEC covers all flushing, inspections, and maintenance of the fire water systems across the SRS.…
784-7A Boiler No. 1 refractory replacement.…
Implement modifications to Building 751-1A that include drilling into transite to mount photoluminescent exit signs and to relocate an electrical r…
Subcontractor will provide roof repairs at 784-3A.…
Subcontractor will provide roof repairs at 703-42A.…
Subcontractor will provide roof repairs at 707-16B.…
Fabrication of scientific glassware and apparatus for SRNL and SRS as needed.…
Gas chromatographs (GCs) are used to analyze non-hazardous samples and to evaluate column packing materials.…