Access to Steel Creek to perform routine long-term sampling of surface water and shallow monitoring wells is not easily accessible. Samplers are re…
The Decon Frit Slurry Recirculation Pump experiences premature diaphragm failures. Review of the manufacturer 's literature identified operational …
Premix Air Blender No 2 Dust Collector (Z-205000-BMH-DCOL-0005) is in need of repair due to brief pressure excursion during normal operation.…
Perform cleaning, seal coating, and restriping of parking lots in A-Area, B-Area, C-Area, and N-Area.…
The existing Liquid Nitrogen delivery system for 735-A lab D-007 has failed due to age and deterioration. This work will include replacement of the…
Six degraded trailers SRS-PB-01030, SRS-PB-01032 (776-12A), SRS-PB-01033 (776-13A), 774-23A, 774-4A, and 774-5A known to contain asbestos containin…
This project will demonstrate an innovative, energy efficient water treatment system for FGD wastewater treatment to remove the key contaminants in…
Thermal Cycle Absorption Process (TCAP) Product Bed C is to be replaced by new components.…
Utilization and modification of 706-3F, 2nd floor to perform engineering classified computing task to support NNSA missions.…
New D3 consoles will be added to TEF and HANM facilities.…