CX-027547: Painting and Paving of Spill Area at 294-1H

The scope of work is to lay a 2" thick (min) layer of 9.5 mil asphalt mix with a non-woven geotextile underlayment applied over a tack coat over th…

Office of NEPA Policy and Compliance

January 13, 2023
minute read time

The scope of work is to lay a 2" thick (min) layer of 9.5 mil asphalt mix with a non-woven geotextile underlayment applied over a tack coat over the existing asphalt road that has been sealed.