The scope of work is to lay a 2" thick (min) layer of 9.5 mil asphalt mix with a non-woven geotextile underlayment applied over a tack coat over th…
Office of NEPA Policy and Compliance
January 13, 2023The scope of work is to lay a 2" thick (min) layer of 9.5 mil asphalt mix with a non-woven geotextile underlayment applied over a tack coat over the existing asphalt road that has been sealed.