Replace Nitrogen Pressure Safety Valves (PSV's) per preventive maintenance work packages.…
The Furnace 100 Process Chilled Water has been shown to be overly acidic for its process function and needs to be drained.…
Sanitary Waste Treatment Facility-Re-coat Concrete Surface in the UV Channel and Cascade System.…
The APSX CNC Spyder machine will be used as a motion table to simulate the powder coating process for laser powder bed fusion - an additive manufac…
SRNL will perform hydrogen isotope separation R and D activities and test related separation equipment.…
Site construction will regrade the ditch along side building 713-3N to prevent water intrusion…
Jackson Boundary monitoring well JAX 1 will be abandoned in-place by grouting to surface. …
The U. S. Department of Energy, U. S. Environmental Protection Agency, and South Carolina Department of Health and Environmental Control agreed tha…
Southern Sector airlift recirculation wells SSR-002 to SSR-012 to be placed out-of-commission and abandoned in place.…
The A-2 Air Stripper has completed its cleanup mission. The South Carolina Department of Health and Environmental Control has agreed that the unit …