Installation of three sets of new pole mounted fiber optic sensors, a new motor-operated three-way high-voltage switch with vacuum interrupter tech…
Funding will support the project team's small-scale research and development activities to design a significantly more efficient, fast, low-cost, c…
Construction of a 34.5 - 14.4/24.94Y, 12/16/20 MVA substation including, but not limited to, disturbing an area of not more than two (2) acres by c…
Preparation and fabrication of polymeric and ionic-liquid based membrane and the characterization of their rheology and electrical and gas transpor…
Funding will support the project team's small-scale research and development of Active, Virtual And resistive Transformers for Transmission and Dis…
The recipient will rebuild its existing 220-47 230kV circuit which will reduce the frequency of transmission line outages caused by equipment failu…
This project focuses on the development and prototyping of a high-performance rare earth element-free electric motor utilizing nanocrystalline soft…
Rebuild 2.4 miles of distribution line and construct 2.4 miles of transmission on the same poles.…
The Geomechanics and Flow Lab will combine three previously permitted NETL labs: GGSCFL, Degradation of Wellbore Cements Due to CO2 Injection, and …
Planning for PECO to rebuild its 220-47, 220-69, and 220-31 230kV circuits which will reduce the frequency of transmission line outages caused by e…