The scope of work would involve the demolition of building 04-026.…
Demolish existing electrical interconnect and install a pre-fabricated enclosure, switchgear, switching station, and support equipment.…
Demolition of buildings 11-54 and 11-54a. Tasks would involve the cutting and capping of the utilities, abate any asbestos within the facility, dem…
Modular and pre-fabricated construction systems for construction of two buildings.…
Pantex is proposing the design and construction of the Flexible Production Support Facility (FPSF).…
The scope of work would include the demolition of Building 12-034 and the associated ramp (buildings 12-034SS, 12-R-034, and 12-019P). …
Currently, the Pantex Plant has a large volume of surplus container inventories. The proposed action would consist of leasing an off-site storage …
Activities addressed by this standard NEPA Review Form include: Routine maintenance and repair activities, Plant rearrangements and/or building mo…
This NEPA document would be considered an "umbrella" document for Pantex Plant projects pertaining to safety, health, and environmental improvement…
The scope of work would include the demolition of Buildings 12-106, 12-106A, and 12-14. These facilities have been deemed excess to the Pantex Pla…