The main objective of this project is to replace the existing East Interconnect. This change would replace the switch house enclosure, 12.47 kV swi…
Office of NEPA Policy and Compliance
February 7, 2022The main objective of this project is to replace the existing East Interconnect. This change would replace the switch house enclosure, 12.47 kV switchgear, fire protection, and relays.