Bonneville Power Administration (BPA) proposes to allow the Willamette Water Supply Program, a partnership among the Tualatin Valley Water District, City of Hillsboro and City of Beaverton, to construct, operate and maintain a buried water supply pipeline at several locations on BPA’s fee-owned rights-of way.
Bonneville Power Administration (BPA) proposes to fund the Confederated Tribes of the Warm Springs Reservation of Oregon to implement the Fence Maintenance and LWD Inspections project in Hood River County, Oregon.
Bonneville Power Administration (BPA) proposes to fund the Confederated Tribes of the Warm Springs Reservation of Oregon to implement habitat prote…
The U.S. Department of Energy (DOE) is proposing to provide federal funding to the Pacific Ocean Energy Trust (POET) to administer the Testing and …
Bonneville Power Administration (BPA) proposes to remove and replace certain fittings used to splice lengths of transmission line conductor togethe…
Bonneville Power Administration (BPA) proposes to fund the Confederated Tribes of the Warm Springs Reservation of Oregon to implement the Fence and…
Bonneville Power Administration (BPA) proposes to continue funding the Columbia River Inter-Tribal Commission (CRITFC) in the Grande Ronde Subbasin…
The U.S. Department of Energy (DOE) is proposing to provide federal funding to the Pacific Ocean Energy Trust (POET) to administer the Testing and …
Keeler-Oregon City No. 2 Transmission Line Right-of-Way Fiber Line Installation…
Joining the Western Energy Imbalance Market (EIM)…