BPA proposes to fund the Burns Paiute Tribe (BPT) (Sponsor) to complete the installation of an underground water pipeline between a well and a reno…
BPA proposes to replace 15 structures and improve access roads on the Fairview-Bandon No. 1, Reedsport-Fairview No. 1, Rogue-Gold Beach No. 1, Tahk…
BPA proposes to allow Central Lincoln People’s Utility District (Central Lincoln) to replace transmission equipment at BPA Gardiner Substation in D…
BPA proposes to relocate structure 3/4 of the Salem-Albany No. 2 115 kV transmission line in Polk County, OR.…
BPA proposes to install conductor between BPA’s Biglow Canyon-John Day No. 1 transmission line and PGE’s Biglow Canyon substation, acquire equipmen…
BPA proposes to fund the Confederated Tribes of the Warm Springs Reservation of Oregon (CTWS) to implement the Dead Cow Wood Placement project.…
Award Number: DE-EE0009451, CX(s) Applied: A9, A11, Water Power Technologies Office, Location(s): OR, Office(s): Golden Field Office
BPA proposes to fund the Burns Paiute Tribe to conduct revegetation and facility upgrades at the BPT’s Logan Valley Wildlife Mitigation cabin site.…
BPA proposes to remove the Big Eddy-Celilo No. 3 and No. 4 transmission lines that run between the Big Eddy Substation and the Celilo DC Converter …
Award Number: DE-EE0008733, CX(s) Applied: A9, B3.6, B5.15, Wind Energy Technologies Office, Location(s): OR, Office(s): Golden Field Office