The Kesselring Site High Yard (substation) 30 Upgrade Project involves the demolition of HY 40, upgrading HY 30
KESSELRING SITE HIGH YARD (HY) 30 UPGRADE PROJECT AND BUILDING 28 UNDERGROUND CONDUIT INSTALLATION PROJECT
This project will replace the current UPS flywheel system with a newer, state-of-the-art system.…
Award Number: DE-EE0009391, CX(s) Applied: A9, B3.6, B3.15, Advanced Manufacturing Office, Location(s): NY, Office(s): Golden Field Office
Award Number: DE-EE0009341, CX(s) Applied: A9, B5.15, Solar Energy Technologies Office, Location(s): NY, Office(s): Golden Field Office
Building 76 Renovation
Award Number: DE-EE0009455, CX(s) Applied: A9, Building Technologies Office, Location(s): NY, Office(s): Golden Field Office
Award Number: DE-EE0009409, CX(s) Applied: A9, B3.6, B3.15, Advanced Manufacturing Office, Location(s): NY, Office(s): Golden Field Office
Award Number: DE-EE0007349, CX(s) Applied: A9, B5.25, Water Power Technologies Office, Location(s): NY, Office(s): Golden Field Office
The scope of this project includes the removal of the existing 40'x40'x9" thick concrete pad, the construction of approximately a 50'x50'x4' thick …