The scope of this project includes the removal of the existing 40'x40'x9" thick concrete pad, the construction of approximately a 50'x50'x4' thick …
The scope of this project is to upgrade the Kesselring Site (KS) Site Service Water (SSW) and the Sanitary Sewer (SS) systems.…
Award Number: DE-EE0007897, CX(s) Applied: A9, A11, B1.31, B3.6, Advanced Manufacturing Office, Location(s): NY, Office(s): Golden Field Office
Award Number: DE-EE0008390, CX(s) Applied: A9, Wind Energy Technologies Office, Location(s): NY, Office(s): Golden Field Office
The scope of the Knolls Laboratory - East Gate Entrance Upgrade Project (Project) is to increase the size of the East Gate vehicle entry and exit l…
The Kesselring Site Head Tanks Corrosion Protection Project includes work to Head Tanks (27A and 27B) for repairs to the interior iron oxide uretha…
Award Number: DE-EE0008390, CX(s) Applied: A9, Wind Energy Technologies Office, Location(s): NY, Office(s): Golden Field Office
Award Number: DE-EE0008390, CX(s) Applied: A9, Wind Energy Technologies Office, Location(s): NY, Office(s): Golden Field Office
Award Number: DE-EE0008390, CX(s) Applied: A9, B3.1, B3.6, Wind Energy Technology Office, Location(s): NY, Office(s): Golden Field Office
Award Number: DE-EE0009236, CX(s) Applied: A9, B3.6, Fuel Cell Technologies Office, Location(s): NY, Office(s): Golden Field Office