The project would deploy Light Detection and Ranging (LIDAR) equipment to generate scans of the tunnel exteriors and other facilities. …
As part of planning activities for the CP Hill waterline replacement, subsurface utility discovery work needs to be performed along selected portio…
Building 23-517, also known as the Bowling Alley, is located in Area 23 (Mercury) at the Nevada National Security Site (NNSS). This building has no…
The Mercury Solar Expansion Project would install a solar photovoltaic (PV) array on the south side of Mercury Fire Station No. 1 in Area 23 (Mercu…
The Atlas facility, located in Building 06-922 at the Nevada National Security Site (NNSS) was constructed in 2003 and conducted Pulsed Power resea…
As part of planning activities for future water and sewer line upgrades, subsurface utility discovery work would be performed along selected portio…
Livermore Operations is under the applicable Maintenance and Operations Contractor for the Nevada National Security Site (NNSS). LO is an applied-s…
An emergency response exercise would be conducted at the Device Assembly Facility (DAF), located in Area 6 of the Nevada National Security Site (NN…
Various Force-on-Force and Engagement Simulation System (ESS) training exercises for Nevada Field Office (NFO) security personnel would take place …
Non-destructive asbestos sampling and analysis would be performed at the following buildings in Mercury (Area 23), located at the Nevada National S…