Categorical Exclusion Determinations: Nevada Site Office

The purpose of this project is to create or widen existing turnaround areas that are located mainly in remote areas of the Nevada National Security…
The original NEPA Checklist (NV-2011-022) covered the installation of a modular building, and the subsequent use of that building. This NEPA Checkl…
This checklist is intended to cover general minor indoor work, and routine maintenance. This checklist does not address construction of new buildin…