Pre-feasibility and pre-FEED study for a Direct Air Capture (DAC) Hub focused on Kern and/or nearby counties in California.…
Develop and implement an on-site emergency response system that will provide a real-time count of personnel physically present on-site in the event…
This scope includes paperwork and data gathering and analysis work to determine the feasibility of developing the intermodal CO2 hub at the selecte…
Install combined battery and heat pump systems, with additional smart thermostats installed where appropriate, in LMI occupied homes. These devices…
CO2 injected into an unconventional oil reservoir (EOR)in the Bakken Formation, storing CO2. Conduct laboratory studies and field-based activities …
The Recipient will improve grid resilience by hardening grid elements, adding weather stations, removing hazards, under-grounding lines, improving …
The entities involved in the project will be installing new transmission line, battery storage, and advanced grid control systems to support grid r…
Scalable and Efficient Membrane Distillation and Adsorption Process for High-Purity Water and Lithium Recovery from Produced Water in New Mexico…
Complete front-end engineering design (FEED) and develop cost estimate for CO2 capture from cement plant flue gas, complete TEA, LCA, business case…