Install 4 115 KV capacitor banks, optical ground wire for communications, and SCADA for increased monitoring of grid components. …
This project aims to establish an automated secure multi-partied virtual power plant paradigm to reduce cyber risks by design meanwhile automatical…
Replacement of 34 electric line protective and switching devices with SCADA-capable upgraded equipment.…
Evaluating and optimizing thermal-chemical reaction parameters using a Joule heating reactor for converting CO2 into carbon monoxide (CO) into poly…
Air Protein will develop and scale-up higher pressure operations of our novel Oxyhydrogen Fermentation and integrate it with an existing gas recycl…
Design, permit, and drill one stratigraphic well directly East of Tampa, FL. Non-field work is also included for data analysis. …
This project will combine output from preconditioning CO2 to various levels of CO prior to fermentation with LanzaTech’s engineered bacterial isopr…
Computer and literature-based research and analysis, report writing (electronic, meetings (remote, teleconference).…
Sorbent preparation and bench-scale testing of the structured sorbent material.…
Update distribution system in Ansley's entire service area from 2.4kV delta to 12.5kV grounded wye. Replace poles, transformers, overhead conductor…